CALCULATION

How much material for a suspended ceiling

How many profiles, hangers, tiles and luminaires a given room needs. The figures follow installation scheme 1 from the KRAFT guide for a 600×600 mm tile and typical illuminance levels. They are a guide — the exact specification for your project is calculated in Onliner 2.0.

Ready calculations

Suspended ceiling components for six standard rooms to installation scheme 1
SpaceAreaStandard, lxRunner 3600 mmCross tee 1200 mmLong tee 600 mmHangersTiles 600×600KRAFT LED
Office100 m²500241401407027831
Office200 m²5004728028014055661
Shop or retail space150 m²3003521021010541728
Café, dining room80 m²200191121125622310
School classroom60 m²5001484844216719
Clinic, consulting rooms120 m²500281681688433437

Calculated to installation scheme 1 for a 600×600 mm tile. The wall angle L profile is taken from the actual room perimeter. The number of luminaires follows typical illuminance levels at a ceiling height of 3.5 m.

How it is calculated

Grid components

Consumption per m² is fixed for each of the eight installation schemes. Scheme 1 takes 0.232 main runners of 3600 mm, 1.4 cross tees in each direction, 0.7 hangers and 2.78 tiles per square metre.

Lighting

The number of KRAFT LED kits depends on the required illuminance for the space type, the floor area and the ceiling height.

What affects accuracy

A complex room shape increases the cutting allowance. Ceiling height, surface colours and window openings all change the number of fittings needed. That is why the final specification is always calculated for the specific project.

FAQ

Frequently asked questions

For the most common scheme with a 600×600 mm tile: 0.232 main runners of 3600 mm, 1.4 cross tees of 1200 mm, 1.4 cross tees of 600 mm, 0.7 hangers and 2.78 tiles per square metre.

Cost depends on the system, the layout and the specification — the difference between solutions can be several times over. We price your floor area free of charge, and you can build the specification yourself in Onliner 2.0.

Its quantity depends on the perimeter, not the floor area. As a rough guide that is 0.216 of a 3000 mm length per square metre, but the exact figure comes from the actual perimeter.

At 500 lx for offices under EN 12464‑1 and a 3.5 m ceiling height, about 31 KRAFT LED kits are needed. The exact number depends on height and surface reflectance — use the calculator.

No. The table is built on scheme 1. Schemes 2, 3 and 5 need twice the main runners and hangers. Full figures for all eight schemes are on the T-profile installation page.