QUESTIONS

A ceiling for the office

In an open-plan office the ceiling is the only surface that can take the noise out: there are no partitions, the floor is carpeted and the walls are occupied. A T-profile grid gives access to everything running above the ceiling, and the type of infill decides whether the room hums or works in quiet.

300 lx recommendedT‑profile grid with infillAccess to building services

OfficesOfficesOfficesOfficesOfficesOfficesOfficesOfficesOfficesOfficesOfficesOfficesOfficesOfficesOfficesOfficesOfficesOfficesOffices
PROJECT SPECIFICS

Ceiling requirements in an office

Open space makes it hard to concentrate

A colleague's conversation carries ten metres. The meeting rooms are booked all day and part of the team asks to work remotely — the floor space the rent is paid for is not working.

Technical solution

WoodAcoustic panels are the only system with a sound-absorption test report. The panels are spread evenly across the area and the T-profile grid stays the same.

Every access to the services costs new tiles

Ventilation, power, low-voltage systems, sprinklers. After a few removals a mineral tile stops sitting flush, and a whole row gets replaced so the difference does not show.

Technical solution

The infill lifts out by hand with no dismantling of the grid. Metal cassettes take repeated removal without damage to the edges.

A reconfiguration means downtime for the team

An office is reconfigured every few years: zones change and partitions move. Wet trades mean stopping work for the whole drying cycle.

Technical solution

The grid assembles by locks, with no cutting or welding. The work stays within the zone and the rest of the office keeps running.

After three years the interior looks older than the furniture

A white tile greys unevenly. The furniture and equipment are still fine, but the room already looks neglected.

Technical solution

Polymer-coated metal cassettes keep their colour and geometry. Any RAL shade — the ceiling matches the corporate standard.

SELECTION

Choose a system and see the full picture

Three systems for the office. Pick one to see the trade-off between quiet, looks and access.

Mesh — Offices · 1/4

Why it fits

For long spans and complex geometry there is KRAFT Mesh — a metal mesh that needs no frequent hangers.

Rated against the criteria

  • Speed of installation: 4 of 5
  • Access above the ceiling: 4 of 5
  • Keeps its looks: 4 of 5
  • Smoke extraction: 4 of 5
  • Acoustics: 3 of 5
  • Design freedom: 5 of 5

Lighting for this system

500lx · Offices and work rooms

FOR CONTRACTORS AND SPECIFIERS

What you need for a budget and specification

Cost
A calculation by floor area is free. Distributors build the specification themselves in Onliner 2.0, without contacting a manager.
Availability
Nova and Fortis T-profiles are always in stock. The HD and RH100 special versions are made to order.
Documents
EU declarations of performance, Euroclass A1 non-combustible. All available to download without a request.
Installation
An installation guide with eight schemes and material quantities per m². The grid clips together, with no cutting or welding.
GALLERY

Offices with KRAFT ceilings

Offices 1/19
Offices 2/19
Offices 3/19
Offices 4/19
Offices 5/19
Offices 6/19
Offices 7/19
Offices 8/19
Offices 9/19
Offices 10/19
Offices 11/19
Offices 12/19
Offices 13/19
Offices 14/19
Offices 15/19
Offices 16/19
Offices 17/19
Offices 18/19
Offices 19/19
FAQ

Frequently asked questions

The ceiling has the greater effect because it is the largest free surface. Partitions of the same material reinforce the result, but on their own they do not solve the problem.

Yes. The tiles sit in the grid and lift out by hand; the T-profile grid itself stays in place.

Yes: acoustic panels in the open space and metal tiles in the corridors lay into one T-grid. Baffles in meeting rooms go on their own carrier — the systems are combined by zone.

Cost depends on the system, the mounting scheme and the bill of materials — solutions can differ several times over. We calculate for your area free of charge; distributors build the specification themselves on the Onliner 2.0 platform.

At least 120 mm from the soffit to the suspended ceiling — a technical requirement for the hangers. The actual drop depends on what runs above the ceiling.

The grid assembles with no cutting or welding: the profiles join by locks and the infill drops in from above. No wet trades, no curing delays.

Yes. KRAFT profile locks disengage without damage, so the structure can be partly dismantled and reassembled.

Get a ceiling calculation for your project

Send us the area and the intended use of the space — we will select the system and calculate materials and cost.

Your details stay with us. No spam.